Category: College/Campus News
Published: May 30 2012 12:00AM
Facilities will be completing construction work on the side walk and entrance into the new Lot 3. This work will start on or around June 4 and end before June 25. This will require one lane and the sidewalk to be closed on the lot 3 side of North Campus drive with one-way traffic only through the construction area from the Hungerford Drive entrance. All traffic past Lots 1 & 2 will have to exit on the south side of Campus at the Mannakee street entrances. There also will be no pedestrian access from Lots 1 & 2 except to GU (Gudelsky) and TT (Technical Training) buildings or parking in Lot 3.
Related Media
- June_Lot_3_2012_Detours.pdf
- June_Lot_3_2012_Detours_inset.pdf
- roadwork2012.jpg
Story Comments
There are currently no comments for this story.
Be the first person to comment about this story
(MyMC authentication required)
Post a Comment
MyMC
Authentication Required